Request for General Contractor Pre-Qualification Submittals- North & Central Electrical Distribution Phase I

North Carolina State University is seeking qualification statements from general contractors for improvements for the North & Central Electrical Distribution Phase 1 project, located on central campus precinct.  The project scope includes:

Phase 1 will replace the existing Sullivan Substation secondary bus 1 with new metalclad switchgear, modify existing bank 2 secondary switchgear to add additional circuit breakers, add additional SCADA hardware and points to the existing system, install distribution ductbank, transfer circuits and demolish the existing overhead bus.

A qualification application document must be submitted by 5:00 pm, 3/23/17, to Damian Lallathin, project manager, at Administrative Services Building III, 2701 Sullivan Dr., Suite 331, NCSU, Campus Box 7520, Raleigh, NC 27695-7520.  Application packages will be available electronically after 3/6/17.

Damian Lallathin
North Carolina State University
Capital Project Management
919-513-0373
dllallat@ncsu.edu

Download Pre-Qualification Package Here: North & Central Electrical Distribution Ph I