Daniels Hall Roof Replacement

The project will remove all existing roofing membranes, separation layers, LG boards and insulation down to the roof deck, and provide and install a new roof membrane and insulation system. Rework of existing exhaust fans, plumbing vents, and other roof penetrations is required. The existing non-penetrating guard rails will be temporarily removed and reinstalled. Note: NC State’s Building Maintenance & Operations personnel will remove the abandoned existing cooling tower and former penthouse observatory frame, and replace the existing RTU as a separate project.

For specific project inquiries – Greg Selzer (919-795-1601)
gjselzer @ncsu.edu
http://facilities.ofa.ncsu.edu/category/ads/

A Pre-submittal Meeting will be held October 6th at 1:00 pm in Conference Room 301, Administrative Services III, 2701 Sullivan Drive on the NC State campus.  Attendance is encouraged but not mandatory.

Closing Date:  5:00 pm, October 20th

Total project budget is $1,000,000

Submit Letter of Interest  and 330 Form to:
Greg Selzer, Project Manager
NC State University, Capital Project Management
Box 7520, Raleigh, NC 27695-7520

Download Complete Project Description Here: Daniels Roof Replacement DCF 1 Project Summary 10-4-16