Centennial Campus Utility Infrastructure – Special Inspection and Construction Material Testing Services

NC State University
Project: Centennial Campus Utility Infrastructure, NC State Project #201620013

Description:  This project will increase chilled water supply capacity via installation of a thermal energy storage tank while reducing the electrical demand associated with the generation of chilled water. Power system improvements will redistribute system loads to alleviate overload on existing circuits, add redundant capacity, and allow for acceptance of new building loads. Additional fuel oil storage capacity, back up for natural gas during curtailment, will be installed to support increased demand on steam generation. The University seeks the professional service of a qualified firm to provide Special Inspections and Material Testing Services for the project. The selected firm is expected to join the team at the beginning of construction.

Contact:  For specific project inquiries – Damian Lallathin (919-513-0373) dllallat@ncsu.edu

http://facilities.ofb.ncsu.edu/category/ads/

Pre-submittal Meeting:  None

Closing Date:  5:00 pm, November 2nd, 2017

Project Budget: Total project budget is approximately $9.6 mil.

Submit Letter of Interest  and 330 Form to:
Damian Lallathin
NC State University, Capital Project Management
Box 7520, Raleigh, NC 27695-7520

Download complete project description here: Centennial Campus Utility Infrastructure Special Inspection and Construction Material Testing Service Project Summary