HVAC Renovations Price Music Hall

The following announcement has been placed in N.C. Purchase Directory located under “University Projects” – Architecture/Engineer Selection.  Please note: The Lead Design Firm must be licensed in the state of North Carolina.

Institution:   NC State University

Project:    HVAC Renovations Price Music Hall
NC State Project #201720105

Description:   Built in 1972, the 24,000 SF two-story building is served by two four-pipe multi-zone AHUs.  Original air distribution duct is lined.  Steam humidifiers in the duct are not operational.  Building heating hot water, chilled water and domestic hot and cold water are served from the Talley Student Center mechanical room.  A steam pressure reducing station (inactive) is installed in the second-floor mechanical room.  Existing controls are pneumatic.

This project will replace the aging building HVAC system, including air handling units, steam humidification, air distribution duct, VAV boxes with zone reheat and digital controls.  Some ACM abatement is anticipated.

Contact:  For specific project inquiries – David Hammock (919-515-2030) david_hammock@ncsu.edu

http://facilities.ofa.ncsu.edu/category/ads/

Pre-submittal Meeting:   A Pre-submittal Meeting will be held February 14, 2018, at 10:00 am in Conference Room 101, Administrative Services III, 2701 Sullivan Drive on the NC State campus.  Attendance is encouraged but not mandatory.

Closing Date:  5:00 pm, March 5, 2018

Project Budget: Total project budget is $975,000

Submit Letter of Interest and 330 Form to:
David Hammock, PE
NC State University,
Capital Project Management
Campus Box 7520
2701 SullivanDrive
Raleigh, NC 27695-7520

Download Complete Project Information Here: Project Summary for HVAC Renovations Price

Download Pre-submittal Documents Here: Price HVAC Pre-submittal Notes and Sign-in