Lake Wheeler Main Distribution Frame

The following announcement has been placed in the N.C. Purchase Directory located under “University Projects” – Architecture/Engineer Selection.  Please note: The Lead Design Firm must be licensed in the state of North Carolina.

Institution:     NC State University

Project:       Lake Wheeler Main Distribution Frame
NC State Project #202020006

Description:   This project constructs a 600 gross square foot, non-combustible building for a future Main Distribution Frame (MDF) telecom installation to bring high-speed internet to the Lake Wheeler Road Field Labs for teaching and research. The building requires redundant mechanical systems, an emergency generator and security system, and fire protection systems to protect the integrity of the equipment located inside. The Inwood Road building site will utilize an existing gravel parking lot for access.

The building will be connected to other parts of campus through a fiber-optic network leased through MCNC, a collaborative network backbone supporting research across the state. The new MDF will connect to the Centennial Campus MDF (Partners I) and to the Central Campus MDF on Dan Allen Drive.

Contact:   For specific project inquiries – Mike Kapp, Project Manager mjkapp@ncsu.edu

http://facilities.ofa.ncsu.edu/category/ads/

Pre-submittal Meeting:   A Pre-submittal Meeting will be held on October 7, 2020, at 3:30 pm virtually via Zoom Meeting. See Project Summary for the meeting link. Note: Project Summary is not available at this time but will be uploaded soon.

Attendance is not mandatory but highly encouraged.

Closing Date:                          5:00 pm, 10/27/20

Project Budget:                       Total project budget is $800,000

Submit Letter of Interest        Mike Kapp, Project Manager

and 330 Form to:                     mjkapp@ncsu.edu

cc:           Mike Kapp, Capital Project Management
Lisa Johnson, University Architect, Office of the University Architect
Ed Rogers

Download Complete Project Summary Here: https://facilities.ofa.ncsu.edu/files/2020/10/Form-1-Project-Summary-Lake-Wheeler-MDF-1.pdf

Pre-Submittal Sign-in and Responses below:

Sign-in Form1. https://forms.gle/53bNU37DASBX3rqe8
Sign-in Responses2. https://docs.google.com/spreadsheets/d/1iZpSgiX6V06z85oL5JG1aWRJ9YbnGoPYVPcjwmSntsc/edit?usp=sharing