Designer Advertisement: Centennial Campus Substation – Reconstruction and Upgrades

Project: Centennial Campus Substation – Reconstruction and Upgrades – NC State Project #202120006

Description: This project reconstructs and upgrades the portion of the Centennial Campus Substation that failed in April 2021. Replacement of the power transformer, 230kV high side bus work and dead end structure, 23kV low side bus work and dip structure, high side circuit switcher, and protection and control circuits. This project will also require coordination with Duke Energy Progress for high side terminations and low side metering.

Contact: For specific project inquiries – Melanie Butler (919-515-8059) mdbodenh@ncsu.edu

Submission Form for Questions: https://forms.gle/6avvduVvUqKPUrcb6

FAQ: https://docs.google.com/spreadsheets/d/1kSqxuzNn8kMkx0RbCBBaF5KEc3r3p7FWVZHF7-oinEM/edit?usp=sharing

Pre-submittal Meeting: A Pre-submittal Meeting will be held February 2, 2022 at 11:30 am via Zoom Meeting. See Project Summary for meeting link. Attendance is encouraged, but not mandatory.

Presubmittal Sign-In Form: https://docs.google.com/forms/d/1JGsnsDWavdyuTY4Q-HKbj0MRaeVer01HSF2vK_pwlGc/edit

Closing Date: 5:00 pm, February 18, 2022

Project Budget: Total project budget is $5,550,000

Submit Letter of Interest and 330 Form to: Melanie Butler mdbodenh@ncsu.edu

Download the project summary below: