Project Description:
This project includes the design and repairs to roof at the College of Veterinary Medicine’s Main Building, located on West Campus. The project will be similar to recently completed repairs of the roof at the CVM Main Building (Phases 1 and 2). This project will include a new roof drain and expansion joint reconstruction. The CVM Main Building was completed in 1983 and located at NC States’s Centennial Biomedical Campus (CBC).
Project Budget & Design Scope:
The budget of $1,000,000 incorporates design and construction.
Project Site:
The project is located at 1060 William Moore Drive in the West Campus Precinct.
Pre-Submittal Meeting:
There will be no pre-submittal meeting for this project. Questions regarding the project can be submitted here: Roof Repairs – Phase 3 – CVM Main RFQ Questions
Responses: Link to Responses
Questions will be responded to by Monday, April 20th by 5:00pm.
Project Schedule:
Design Start: Summer 2026
Anticipated Construction Start: Winter 2026
Anticipated Construction Completion: Summer 2027
Design Process:
The selected firm will work through Design and Construction, Campus Planning and Strategic Investment and the Project Manager along with a building committee that includes user representatives. The process will include normal involvement of the State Construction Office.
Critical Selection Factors:
In order to offer architectural or engineering services in response to this solicitation, the proposer must be licensed in the State of North Carolina. Interested firms can participate in the process by submitting a current SF 330 form and addressing the following in a written proposal. Please note that only electronic copies of the proposal, submitted via email to the project manager, are requested. Most of the criteria listed below can be accommodated in sections A-G of the 330 form. Section H can be used for any additional information. The total submittal, including letter of interest, is limited to 26 sheets of paper. Both sides of the sheet may be used for a total of 52 pages. Firms are requested to assure receipt of proposals at the address listed below by 05:00 PM on April 24, 2026.
Criteria
- Experience and expertise with similar projects.
- Past performance on similar projects.
- Experience in design projects to be part of an existing campus context.
- Adequate staff and proposed consultant team – qualifications and examples of previous collaborations.
- Historically Underutilized Business representation in the proposed consultant team
- Current workload and State projects awarded.
- Proposed design approach or methodology.
- Recent experience with project cost estimates and schedule adherence.
- Construction administration capabilities.
- Record of successfully completed projects without major legal or technical problems.
- A minimum of three references with current contact information, including a phone number and an email address.
Designer Selection Process:
Following the receipt of proposals, a University Interview Committee will shortlist, interview, and make a selection.
Questions/Proposal Submittal:
In order that the selection process is as objective as possible, do not contact members of the Board of Trustees, or any university officials other than the project manager. All questions and project submittals are to be directed to:
Laura Zaytoun
llzaytou@ncsu.edu