North Carolina State University is seeking qualification statements from general contractors for improvements to Roof Repairs – Phase 3 – CVM Main Building located in West Precinct. The project scope includes construction repairs to the leaking roof, similar to recently completed roof leak repair projects: Phases 1 and 2. Includes roof drain and expansion joint reconstruction. To qualify, the contractor must have a general contractor’s license in the State of North Carolina as well as applicable bonding requirements. The contractor must show comparable work experience, both in complexity and dollar value, and preferably in a university campus environment, to the scope of work outlined above.
To be considered, the contractor must obtain an application package from the NC State University Project Manager and submit a fully completed qualification document by 5:00 pm, September 10, 2026, to Bosa Grgurevic, project manager, by email only to [email protected]. No hard copies will be accepted. Application packages will be available electronically after 8/17/26. Please contact the project manager via email (preferred) or phone to request a package or download it from the link below.
Application packages must be submitted to the following email address: [email protected]
NOTE: The SCO Prequalification Package has been updated recently. Please use the project-specific form provided by NC State by the link below. Submissions on any other form will be considered nonresponsive.
Bosa Grgurevic
NC State University
Design & Construction
919.513-0223
Email (questions only): [email protected]
Download Prequalification Form Here: Roof Repairs – Phase 3 – CVM Main Building