Burlington Labs

Asset:

Burlington Labs – Air Compressor Removal

Project Manager:

Steven Eisenberg

Total Cost:

$2,959

Cost Per Square Foot:

$N/A

Completion Date:

Jan 14, 2015

Narrative:

Steven Eisenberg, Project Manager, worked with the R&R Construction and General shops to remove the outside air compressor and tank, remove the pipes, patch exterior brick wall,  and move dryer from electrical room to basement mechanical room.  As well as install dryer to work with existing air compressor.

Work Order Number: 15-36001

Notes: