Engineering Building III

Asset:

EBIII – Rm 4112

Project Manager:

Annette Snead

Total Cost:

$9,989

Cost Per Square Foot:

$N/A

Completion Date:

Aug 14, 2014

Narrative:

Annette Snead, Project Manager, worked with the R&R Construction, Paint, Sign, and Carpentry Projects to install a 208-V 3 Phase fused disconnect, processed chilled water (PCW) lines, and a floor-level 4″ diameter port between rooms 4112 and 4114 of EBIII.

Work Order Number: 14-70439

Notes:

Before Image:

After Image:

Published in .

Leave a Reply