Total Cost:

$16,200

Cost Per Square Foot:

$N/A

Completion Date:

Jul 31, 2013

Narrative:

Joe Riley led renovation of rooms 2120 and 2120A of Jordan Hall. Installing a lay-in ceiling, light fixtures, duct work, diffuser, and AV infrastructure,and carpet tiles. The existing sprinkler heads and fire detection system was also modified. Requested items were removed from the walls, and they were painted and patched.

Work Order Number: 13-49237