NC State University is seeking qualification statements from general contractors for improvements to the Tri-Towers Mechanical Systems Update, located in NC State’s Central Campus precinct. This project will renovate the HVAC system in Bowen Hall (built in 1968). The renovation will focus on outside air makeup and exhaust air systems to address moisture intrusion issues.
To qualify, the contractor must have a general contractor’s license in the State of North Carolina as well as applicable bonding requirements. The contractor must show comparable work experience, both in complexity and dollar value, and preferably in a university campus environment, to the scope of work outlined above.
To be considered, the contractor must obtain an application package from the NC State University Project Manager and submit a fully completed qualification document by 5:00 pm, June 16, 2025, to David Hammock, project manager, by email only to DC_Formal_Prequal@ncsu.edu. No hard copies will be accepted. Application packages will be available electronically after May 17, 2025. Please contact the project manager via email (preferred) or phone to request a package or download it from the link below.
Application packages must be submitted to the following email address: DC_Formal_Prequal@ncsu.edu
NOTE: The SCO Prequalification Package has been updated recently. Please use the project-specific form provided by NC State by the link below. Submissions on any other form will be considered nonresponsive.
NC State University has an affirmative policy of fostering, promoting, and conducting business with women and minority owned enterprises. Women and minority contractors are encouraged to participate in the prequalification process.
David Hammock, PE
NC State University
Design & Construction
919-515-2030
Email (questions only): david_hammock@ncsu.edu
Download the prequalification package here: Prequal Form – Tri Towers Mechanical Systems