North Carolina State University is seeking qualification statements from general contractors for the DH Hill Library Waterproofing Phase 2 project located on North Campus. This project will address leaky window caulk/sealants in several locations on this existing library high-rise facility.
To qualify, the contractor must have a general contractor’s license in the State of North Carolina as well as applicable bonding requirements. The contractor must show comparable work experience, both in complexity and dollar value, and preferably in a university campus environment, to the scope of work outlined above.
To be considered, the contractor must obtain an application package from the NC State University Project Manager and submit a fully completed qualification document by February 13, 2026 to Bob Cwikla, Project Manager, dc_formal_prequal@ncsu.edu
No hard copies will be accepted. Application packages will be available electronically after January 13, 2026. Please contact the project manager via email (preferred) or phone to request a package or download it from the following link:
https://facilities.ofa.ncsu.edu/category/ads/
NOTE: The SCO Prequalification Package has been updated recently. Please use the project-specific form provided by NC State by the link below. Submissions on any other form will be considered nonresponsive.
NC State University has an affirmative policy of fostering, promoting, and conducting business with women and minority owned enterprises. Women and minority contractors are encouraged to participate in the prequalification process.
Bob Cwikla
North Carolina State University
Design and Construction
919-949-1553
Email: rmcwikla@ncsu.edu
Download the project-specific SCO Prequalification Form here.
