Campus Construction Zone Impacts

NC State and its various campus partners are working to minimize the impacts of ongoing construction around campus. Below are the most recently updated construction zone maps (interactive and pdf) as well as a map (pdf) highlighting accessible pathways for navigating North Campus construction areas.

North Campus Construction

NC State has concurrent projects on the north side of campus impacting several buildings between Yarbrough Drive and Hillsborough Street. The ongoing construction in and around the Brickyard requires select pedestrian and vehicular routes shift as our work continues. Stay up-to-date on the construction zones and accessible pathways below.

  • The new water line on Morrill Drive was successfully installed. All lanes and parking spaces on the road are now open.
  • A temporary accessible pathway through the Brickyard area will be in place until Monday, Feb. 2. Those traveling between the Woodson Hall construction site and D.H. Hill Jr. Library will need to proceed north to Founders Drive and then travel along the north side of the library to access buildings to the east and west. Signs have been posted to help navigate the route changes.
  • If you need assistance, Wolfpack Pick Up offers free, scheduled golf cart transportation across Main Campus for those with short- or long-term impairments.

The NC State campus map contains more detailed parking options as well as building and tunnel locations.