Request for General Contractor Prequalification Submittals- Roof Replacement – Engineering Building I (EB1)

North Carolina State University is seeking qualification statements from general contractors for improvements to Roof replacement – Engineering Building I, located on Centennial Campus.  The project scope includes design and construct repairs to leaking roof. Includes roof drain and expansion joint reconstruction.

To qualify, the contractor must have a general contractor’s license in the State of North Carolina as well as applicable bonding requirements.  The contractor must show comparable work experience, both in complexity and dollar value, and preferably in a university campus environment, to the scope of work outlined above.

To be considered, the contractor must obtain an application package from the website and submit a fully completed qualification document by 5 pm June 3, 2025, to Bosa Grgurevic, project manager, by email only to DC_Formal_Prequal@ncsu.eduNo hard copies will be accepted.

Application packages must be submitted to the following email address: DC_Formal_Prequal@ncsu.edu

NOTE: The SCO Prequalification Package has been updated recently. Submissions on any other form will be considered nonresponsive.

NC State University has an affirmative policy of fostering, promoting, and conducting business with women and minority-owned enterprises.  Women and minority contractors are encouraged to participate in the prequalification process.

Bosa Grgurevic
North Carolina State University
Design & Construction
919.513.0223
Email (questions only): bgrgure@ncsu.edu

Download the prequalification package here: Roof Replacement – Engineering Building I (EB1)