Advertisement for Subcontractor Prequalification – Doak Field Phase 2 Baseball Renovation and Addition

Notice to Subcontractors: Romeo Guest – Right Build, A Joint Venture, on behalf of NC State University, is prequalifying subcontractors for the bid packages noted below related to Phase 2 of the Baseball Renovation & Addition project at Doak Field.  This project includes new player performance space along with renovations and additions to concessions and premier fan experience amenities.

Bid Packages for Phase 2 will include:

Bid Package Anticipated Values
2-01A General Trades $366,747.00
2-01B Final Cleaning $11,349.00
2-01C Surveying & Staking $16,000.00
2-02A Demolition $69,055.00
2-03A Cast -In-Place Concrete $1,627,450.00
2-04A Masonry $733,100.00
2-05A Structural Steel $1,055,853.00
2-05B Architectural Metals $611,548.00
2-05C Turnkey Steel $1,667,401.00
2-06A Architectural Millwork $109,922.00
2-07A Membrane Roofing $159,752.00
2-07B Metal Roofing/ Soffits & Fascia $495,790.00
2-07C Turnkey Roofing $655,542.00
2-07D Metal Wall Panels & Louvers $312,264.00
2-07E Air Barriers $80,250.00
2-07F Joint Sealants and Subgrade Waterproofing/ Dampproofing $171,150.00
2-07G Mezzanine Waterproofing $106,625.00
2-07H Spray Foam Insulation $7,565.00
2-08A Doors, Frames and Hardware $75,765.00
2-08B Aluminum and Glazing $313,215.00
2-08C Acrylic OHD’s and Coiling Service Doors $117,120.00
2-09A Drywall Assemblies $586,622.00
2-09B Acoustical Ceilings and Panels $127,241.00
2-09C Carpet and Resilient Flooring $59,876.00
2-09D Floor and Wall Tile $52,266.00
2-09E Terrazzo Flooring $42,710.00
2-09F Rubber Sports Flooring $19,600.00
2-09G Turnkey Flooring $174,452.00
2-09H Painting and Coatings $68,470.00
2-10A Specialties $42,060.00
2-11A Sports Equipment and Indoor Synthetic Turf $219,730.00
2-12A Window Blinds $16,400.00
2-14A Wheelchair Lift $26,500.00
2-21A Fire Protection $115,000.00
2-22A Plumbing $655,438.00
2-23A HVAC $1,100,000.00
2-26A Electrical $1,307,860.00
2-32A Turnkey Sitework $1,209,974.00
2-32B Site Concrete $158,498.00
2-32C Fence and Gates $43,900.00
2-32D Exterior Synthetic Grass Surfacing $22,432.00

Important Items to Note:

  • First tier subcontractors must pre-qualify to be considered for contract award. Note, 2nd tier subcontractors will not be required to pre-qualify.
  • A Pre-Proposal Meeting will be hosted on 6/20/2024 @ 2:00pm at Administrative Services III – 2701 Sullivan Drive Raleigh NC 27607 RM: 124A & B.
  • The targeted bid day TBA at a later time.
  • Pre-Qualification Deadline: Thursday, July 11, 2024 @ 5:00pm

Download the Project Summary here.