Request for General Contractor Prequalification Submittals- Utility Plant Capacity Expansion – Yarbrough Chiller Plant

North Carolina State University is seeking qualification statements from general contractors for improvements to the Utility Plant Capacity Expansion – Yarbrough Chiller Plant, located in the North Campus precinct.  This phased project will add a 2,000-ton electric chiller to the Yarbrough Chiller Plant, including all necessary pumps, piping, appurtenances, and controls integration.

To qualify, the contractor must have a general contractor’s license in the State of North Carolina as well as applicable bonding requirements.  The contractor must show comparable work experience, both in complexity and dollar value, and preferably in a university campus environment, to the scope of work outlined above.

To be considered, the contractor must obtain an application package from the NC State University Project Manager and submit a fully completed qualification document by 5:00 pm, October 21, 2024, to David Hammock, project manager, by email only to DC_Formal_Prequal@ncsu.eduNo hard copies will be accepted. Please contact the project manager via email (preferred) or phone to request a package or download it from the link below.

Application packages must be submitted to the following email address: DC_Formal_Prequal@ncsu.edu

NOTE: The SCO Prequalification Package has been updated recently.  Please use the project-specific form provided by NC State by the link below. Submissions on any other form will be considered nonresponsive.

NC State University has an affirmative policy of fostering, promoting, and conducting business with women and minority owned enterprises. Women and minority contractors are encouraged to participate in the prequalification process.

Download Prequalification Package Here: Utility Plant Capacity Expansion – Yarbrough Chiller Plant

David Hammock, PE
NC State University
Design and Construction
919-515-2030
Email (questions only):  david_hammock@ncsu.edu