Project: Cates West Development, NC State Project #202420022
Description: This project will provide new student housing and dining facilities in multiple phases to address increasing demand driven by enrollment growth and the freshman live-on campus requirement. The project will construct about 3000 traditional and semi-suite style student beds and a new 1500-seat dining facility on Central Campus. Three existing student housing buildings, a dining facility, and a small service building at the end of their useful lives will be demolished as part of this multi-phase project. The goal is to continue to increase the bed count with each phase. The project includes a new regional utility plant and utility distribution.
Download the project summary below:
Project Site: The project site is located in the Central Campus precinct. The site is approximately 35 acres and is bounded by Thurman Drive and the railroad to the North; the Western edge of Lee Field to the West; Rocky Branch Creek to the South; and Dan Allen Drive to the East. In addition, the survey shall include an area bounded by Cates Avenue to the North; Dan Allen Drive to the West; Rocky Branch Creek to the South; and Carmichael Wellness and Recreation Center to the East. Existing buildings on the site that are planned to be demolished as part of the project include Lee Residence Hall, Sullivan Residence Hall, Bragaw Residence Hall, Fountain Dining Hall and the West Dunn Building. Finish floor elevations will be needed for these structures.
Project Schedule: The designer selection process is scheduled to be complete by mid-January 2024, with contracting expected to occur in February 2024. The selected firm shall be ready to kick-off the survey as soon as contracting is complete, and work diligently and fully staffed until completion of the survey. We anticipate the draft survey to be delivered in mid-May or sooner.
Submission Closing Date: 5:00 PM on December 17, 2024
Proposal Submittal
To ensure the selection process is as objective as possible, do not contact members of the Board of Trustees, or any university officials other than the project manager. All questions and project submittals are to be directed to:
Laura Zaytoun
Project Manager, Design and Construction
919-513-0056
llzaytou@ncsu.edu
Please note that only electronic copies of the proposal, submitted via email to the project manager, are requested.