Designer Advertisement – Roof Replacement – Engineering Building 1

Project: Roof Replacement – Engineering Building 1, NC State Project # TBD

Description: Engineering Building I, constructed in 2004, is a four-story building with about 160,000 gross square feet. This project replaces the existing roof and includes the reconstruction of roof drains and expansion joints.

Download the project summary below:

Project Budget: The budget of $2,500,000 incorporates design, construction, and all associated soft costs.

Project Site: The project is located at 911 Partners Way in the Centennial Campus Precinct.

Project Schedule: Planned completion of the project is December 2025.

Submission Closing Date: 5:00 PM on November 4, 2024

Proposal Submittal
To ensure the selection process is as objective as possible, do not contact members of the Board of Trustees, or any university officials other than the project manager. All questions and project submittals are to be directed to:

Bosa Grgurevic
Project Manager, Design and Construction
919-515-0223
bgrgure@ncsu.edu

Please note that only electronic copies of the proposal, submitted via email to the project manager, are requested.

https://facilities.ofa.ncsu.edu/category/ads