page-hall-before-300×226

Page Hall
Asset: Page Hall – Room 233
Completion Date: 10/2015
Total Cost: $7630.00
Cost per Square Foot: n/a
Project Manager: Annette Snead
Annette Snead, Project Manager, led the Construction, Paint and Carpentry Projects Shops to remove storefront and the wall connecting Rooms 233 and X233. The Shops installed bulkhead separating the rooms. They relocated the thermostat and receptacles. Connected lights to an existing light switch. Installed Carpet border. Patched and painted walls there needed.

Work Order Number: 16-12051

Page Hall
Asset: Page Hall – Room 233
Completion Date: 10/2015
Total Cost: $7630.00
Cost per Square Foot: n/a
Project Manager: Annette Snead
Annette Snead, Project Manager, led the Construction, Paint and Carpentry Projects Shops to remove storefront and the wall connecting Rooms 233 and X233. The Shops installed bulkhead separating the rooms. They relocated the thermostat and receptacles. Connected lights to an existing light switch. Installed Carpet border. Patched and painted walls there needed.

Work Order Number: 16-12051